Report - High visibility campaign 2026 (small mines)

Compliance findings for all sectors

During a two-week inspection campaign in July 2026, Resources Regulator inspectors attended 123 mines sites across three mining sectors at coal, metalliferous, extractives and small mines.

A total of 321 compliance notices were issued at 85 mine sites (across all three sectors).

Notice type Total compliance notices issued Number of mines (all sectors) issued a compliance notice
s195 prohibition notice 23 15
s191 improvement notice 220 72
s23 notice of concern 78 57
Total 321 85

Note: not all mines were issued a compliance notice and some mines were issued multiple compliance notices.

The top three principal hazard or control plan topics and material unwanted events (MUE) that were the subject of compliance notices across all three sectors were:

  • Mechanical engineering control plan - unintended interaction with rotating or moving equipment (34 out of 85 MECP topic compliance notices)
  • Air quality or dust or other airborne contaminants – exposure to dust and airborne contaminants (including diesel particulates) in excess of exposure standards (subject of 25 compliance notices)
  • Roads or other vehicle operating areas (ROVOA) – collision of vehicle or mobile plant (subject of 20 compliance notices)
Chart showing the top 3 principal hazard or control plan topics for the high visibility campaign 2026
Chart 1: All sectors-top 3 principal hazard or control plan topics in s191/s195 compliance notices issued during the campaign

Assessment program at small mines

Operation type assessed

Operation type Number of mines assessed
Surface 25
Borrow pit 1
Total 26

Criteria assessed

Campaign scope: Review of sandstone block cutting sites in NSW

  • Review the site Safety management system (SMS) that manage the risks associated with stone cutting, extraction and processing, and confirmation that controls have been implemented.
  • Site assessment covering mine status, identification and management of respirable crystalline silica and crystalline silica substances (RCS and CSS) and safe work practices of cutting stone.
  • Verification of compliance discussion with site supervisors and workers at the site 

Compliance notice type issued to coal mines during the program

Coal operation type WHS(MPS)A s23 notice of concerns WHSA s191 improvement notice WHSA s195 prohibition notice
Surface 6 53 6
Borrow pit 1 3 0
Total 7 56 6

A total of 69 compliance notices were issued to 16 Small Mine sites – sandstone block cutting.

2026 Campaign compliance notices topics issued at small mine sites

The top three improvement compliance notice (WHSA s191) and prohibition compliance notice (WHSA s195) topics by principal hazard or control plan and material unwanted event (MUE) issued at small mine sites (sandstone block cutting) were:

  • Mechanical engineering control plan (MECP) – unintended interaction with rotating or moving equipment (9 out of 18 MECP topic compliance notices issued)
  • Air quality or dust or other airborne contaminants (11 compliance notices issued)
  • Various principal hazards – various topics (11 compliance notices issued)
Chart showing the principal hazard or control plan topics for small mines for the high visibility campaign 2026
Chart 2: Small Mines-all principal hazard or control plan topics in s191/s195 compliance notices issued during the campaign

Recommendations

Operators of Small Mine sites (sandstone cutting sites) should review the following topics identified during the Regulators campaign.

Mechanical engineering control plan

Review implementation of risk controls relating to the site MECP: 

Plant and equipment

  • Plant and equipment were not maintained fit for purpose
  • Maintenance completed to OEM standards by trained and qualified tradespersons. Records must be maintained.
  • Ensure pre-start inspections and plant introduction to site inspections are completed and documented by trained and competent workers.
  • Removable guarding (removed using tooling).
  • Maintenance of a separation distance from unguarded entanglement hazards (safe standing zone, exclusion zone, no-go zone, drop zone).
  • Equipment is prevented from operation while people are working near hazards (isolation process).
  • OPG fitted (or equivalent) to excavator using a cutting saw or rock hammer

Air quality or dust or other airborne contaminants

Safety management systems

Site TIER ranking with the Resources Regulator

  • Review if the Tier 3 quarry site has expanded operations to a Tier 2 operation resulting in an unqualified quarry manager supervising the operation
  • Review sites Tier ranking by completing the Risk profiling tool (DOCX, 860.43 KB)
  • If Tier 2, ensure quarry manager holds a current practising certificate that authorises the exercise of the statutory function. Practising certificate application process

Quarry managers and supervisors

  • Quarry managers and supervisors were not fully aware of their responsibilities in relation to site supervision and current WHS legislation requirements
  • Mine operators must ensure that the Quarry Manager is readily available to exercise and capable of exercising the statutory function i.e. supervising mining operation
  • Attend the annual Small Mines Roadshow Presentation to keep updated in legislation changes and industry knowledge.
  • Refer to the Resources Regulator's video Supervision: A critical safety role
  • Subscribe to the Mine Safety News